Roads 2a-2a - Universiade
Infrastructural works around the Universiade complex .
| PROJECT DETAIL |
LOCATION INVESTOR DESCRIPTION OF WORKS LENGTH VALUE OF WORKS WORKS END |
Construction works on roads 2a-2a, Đorđa Stanojevica and part of Đorđa Stanojevica Street from the entrance to the tram depot to its executed part in block 67 (New Belgrade) has been constructed in record time - less than 2 months.
Works included making asphalt road (excavation, embankment, asphalt), installation of new curbs, concrete plates, manholes, pipes and rainwater sewage, water and sewage networks, electrical networks for supplying public lighting and light signalling, cable sewage for making light signalling, landscaping of flat and inclined surfaces and shoulder, marking the horizontal and vertical installation of traffic signalization, works on the development of gas installations, heating protection as well as performing concrete works on public lighting foundation, plumbing manholes, etc.